I wanted to finish the tasks needed to close up the Tunnel. The Fuel Selector Bracket needed work. I got some 0.063 aluminum and cut out a new bracket using the original as a template. The Andair valve has holes for nutplates making installation easy. I'll have to make sure the valve is properly aligned and then rivet the bracket into position.